Skip links

Proposal to revise BS5975

Please be advised that the proposal for the revision of BS 5975 Management procedures for the control of temporary works and BS 5975-2 Code of practice for the design of falsework is now available on the standards development portal:

https://standardsdevelopment.bsigroup.com/projects/9019-03331

Anyone interested in commenting can do so in the above link. The deadline for comments is 31st October.

It is stated in the proposal, but please be aware that this proposal is to split the standard and revise section 3 only. Only minor editorial changes will be made to sections 1 and 2 to make part 1 a standalone document.

Peter Walker

BCSA Director Health, Safety and Training

Email: pete.walker@steelconstruction.org